2010

  • 903

    Installation of waler & struts support system of tunnel retaining wall at Downtown Line Stage 1 C903.(Bugis Station and Associated Tunnels)

  • Marina Bay Sands

    Installation of Bridge & Canopy and Temporary support system, Supply manpower for installation of Sky-park at top of 3 block 57 storery Hotel and installation of steel works of Museum at Marina Bay Sands Integrated Resort project.&Installation of structural steel works for Theatre 1 of the Marina Bay Sands.

  • Duxton HDB Flat Link Bridge

    DUXTON HDB FLAT LINK BRIDGE @ 26th & 50th STOREY

  • 482

    Marina Coastal Expressway C-482. Assamble, Erect and Remove on Completion of Temporary Steel Walling and Strutting Works.